Five Guys

AIR BASE RAMSTEIN
Domino's Pizza logo

QUB® modules solve location issues

No room at the air base? Can't be. 

For years, site realization at Ramstein Air Base was a challenge for FIVE GUYS - classic food court areas were simply not available. This hurdle was successfully overcome by using the QUB® system.

The modular design ensured that a fully-fledged FIVE GUYS store could be set up quickly and precisely on the site. The possibility of dismantling the store, using it elsewhere and the short construction time on site convinced those responsible.

Since 2022, the location on the largest US military base outside the United States has been supplying tens of thousands of Americans living there with the popular Better Burger concept from home - thanks to QUB®.

CONSTRUCTION TIME

Planning
8 weeks
----------------------
Production in the factory
12 weeks
----------------------
Installation on site
3 weeks

SIZE

Floor space
240 square meters
----------------------
Modules
8 units each 2.5 m x 12 m
----------------------
Seating
45 indoor, 50 terrace

SPECIAL FEATURE

Bilateral building regulations
German building law + US military requirements
----------------------
Ventilation system made entirely of stainless steel
----------------------
Customized technology
Cash register system, making line, etc.

BASIC DRAWING

Floor plan Five Guys modular construction made by ROKA
Image of the two operators of the Watt'n Blick beach bar in modular gastronomy from ROKA.
"We were in talks with the base for four years to develop this location, but there was simply no space available. After the first successful location with the QUB® system at the Fashion Outlet Zweibrücken, we proposed this solution to the Air Base and were immediately given a space on the site."

Jörg Gilcher, Head of FIVE GUYS Germany

Inquiry - QUB® modular construction

Come and visit us!